Noisy work activities
Metro Service A/S is responsible for the operation and maintenance of the existing Metro system.
This notice is to inform the public about the performance of noisy work during nighttime hours
September 6, 2026, through September 18, 2026.
The work is being carried out as part of routine maintenance to comply with legal requirements regarding the Metro’s rail and operational safety.
The work is being performed at night out of consideration for Metro passengers, as this minimizes the disruption caused by the work.
About Noise Disturbances
Noise disturbances may occur, as the work involves the removal of vegetation and is carried out using electric and/or gasoline-powered brush cutters.
Noise disturbances may occur, and therefore residents will be notified as usual via the Metro’s website. The Metro strives to carry out these noisy tasks with as little disruption as possible, but apologizes for any inconvenience the work may nevertheless cause.
During, as well as immediately before and after, the specified time periods, there will be traffic to and from the site involving diesel-powered work vehicles. A detailed description of the work tasks is provided in the table below.
Weeks 36, 37, and 38 – 2026
Work on open Metro sections consists of:
- Ballast tamping using a tamping machine and work vehicles—weeks 36, 37, and 38
- Replacing tiles at stations using hand tools—weeks 36 and 37
- Flushing manholes with a high-pressure washer—week 37
| Stretch | Work in Weeks 36 and 37 | Period | Time period |
|---|---|---|---|
|
1. Femøren to Lufthavnen |
1. Ballast tamping |
Sept. 6–7 |
1. 21:30 - 04:45 2. 20:00 - 04:45 |
| 1. Øresundsvej to Femøren 2. Vest Amager to Dr byen |
1. Ballast tamping |
Sept. 7–8 | 1. 21:30 - 04:45 2. 20:00 - 04:45 |
| 1. Øresundsvej to Femøren 2. Vest Amager to Dr byen |
1. Ballast tamping |
Sept. 8–9 | 1. 21:30 - 04:45 2. 20:00 - 04:45 |
| 1. Vanløse to Solbjerg 2. Vest Amager to Dr byen 3. Vanløse – Lindevang- øresundsvej |
1. Ballast tamping |
Sept. 9–10 | 1. 01:00 - 04:45 2. 20:00 – 04:45 3. 21:30 - 04:45 |
| 1. Vanløse to Solbjerg 2. Vest Amager to Dr byen |
1. Ballaststampning |
Sept. 10–11 | 1. 21:30 - 04:45 2. 20:00 - 04:45 |
| Stretch | Work Week 38 | Period | Time period |
|
1. Vanløse to Solbjerg |
1. Ballast tamping |
Sept. 13–14 | 1. 21:30 - 04:45 |
| 1. DR Byen to Bellacenter |
1. Ballast tamping |
Sept. 14–15 | 1. 21:30 - 04:45 |
| 1. DR Byen to Bellacenter |
1. Ballast tamping |
Sept. 15–16 | 1. 21:30 - 04:45 |
| 1. Bella Center to Vestamager |
1. Ballast tamping |
Sept. 15–17 | 1. 21:30 - 04:45 |
| 1. Metrovej 3 / Control and maintenance center |
1. Ballast tamping |
Sept. 15–18 | 1. 21:30 - 04:45 |